Skip to content
COMMERCIAL

Davidson Commercial Floor Coatings

Davidson is a small town with a busy middle. Storefronts and offices sit around the college, restaurant kitchens work behind them, and flex buildings line the I-77 side of town. We coat those floors at night or across a weekend, with the owner doing the work himself, so your doors open on time the next morning.

Call (704) 775-1120 Plan an After-Hours Install
DAVIDSON

What Davidson Businesses Actually Stand On


Most commercial floors in Davidson are a long way from a warehouse plate. They are the sales floor of a shop downtown, a hallway in a professional office, the back-of-house kitchen behind a restaurant, and the flex buildings toward I-77 where a contractor keeps an office up front and a work bay behind it. Each of those rooms wears out in its own way. A sales floor takes grit and sand tracked in from the sidewalk. A kitchen takes hot water, grease and dropped sheet pans. A flex bay takes pallet jacks, tool carts and whatever drips out of a work truck parked inside overnight.

Empty warehouse floor finished in a high-gloss light gray coating that mirrors the overhead strip lights, steel columns and two rows of windows across the far wall
One solid gray color across the whole floor, which leaves no pattern to match when a damaged section gets patched later.

So every Davidson commercial job starts with a walk through the space, ideally while it is running. We want to see where the carts turn, where the mop bucket sits, where water comes in at the back door when it rains. Then we take moisture readings. Plenty of buildings in town have been remodeled more than once, and the concrete under them is often older than the business on top. What that slab is pushing up decides which primer goes down first, and that choice is the difference between a floor that holds and one that blisters a few months after you reopen.

Robert runs every install himself. Nobody you have never met shows up at nine at night with a key to your building. Travel up from Charlotte is part of the number, and Davidson jobs go on the same calendar as Charlotte jobs, so being 22 miles up the interstate does not move you to the back of the line. Call (704) 775-1120 or send us the building details and we will set a time to come look.

Six Kinds of Davidson Floor We Coat


Storefront Retail

Sales floors see sidewalk grit every day and rolling display fixtures every season. We usually lay a flake broadcast under a polyaspartic seal here, since the flake hides tracked-in dirt between cleanings. The color can lean toward the store’s interior so the floor reads as part of the shop instead of a garage.

Restaurant Kitchens

Back-of-house needs grip under wet shoes and no seam for grease to settle into. Prep and dish areas get an aggressive anti-slip texture, and an integral cove carries the coating up the base of the wall, so the floor-to-wall joint gets hosed and squeegeed rather than scrubbed on hands and knees.

Offices and Suites

Professional spaces usually want a calm solid color and as little odor as we can manage. With tenants working upstairs or next door, we pick the system with that in mind, plan ventilation with the building manager, and put the loud step, diamond grinding, in hours when nobody is at a desk.

Flex and Light Industrial

Buildings that pair a front office with a work bay get two treatments. The bay takes a heavier broadcast epoxy built for pallet jacks and dropped tools, and the office gets a lighter finish. Lane lines and parking marks go down in the same visit, so the bay is ready the day it reopens.

Lobbies and Restrooms

Entries, corridors and restrooms in small commercial buildings carry the most feet per square foot. A seamless coating with a light texture stands up to daily mopping, and in a restroom the cove base keeps standing water off the drywall where tile grout used to let it soak in.

Remodeled Older Slabs

Pull up old tile or carpet in a building that has changed hands a few times and you find mastic, patched trenches and floors that were never level. Grinding, crack repair and patching happen before any coating, and the quote lists that prep on its own line so you can see exactly what it covers.

How We Sequence a Building That Can’t Close


Very few businesses in a town this size can shut down for three days. So the install gets planned around your hours. A small storefront or office often fits between closing on Saturday and opening on Monday. A restaurant kitchen might be done across two nights after the last ticket goes out. A larger flex building goes in sections: we coat one half while you keep working in the other, then switch, with plastic walls taped up between the two so dust stays on our side.

The calendar is set by cure time, not by how fast we can move. A polyaspartic finish takes light foot traffic after about a day and heavier loads after about two. A thick epoxy build can need roughly three days before equipment rolls across it. For general commercial use, a broadcast system lands around 30 to 40 mils of total thickness, and anything carrying heavy carts gets built up from there. We choose the system with your reopen date in mind and write the timing into the quote, so your staff are not testing the floor with the toe of a shoe on Monday morning.

The last decision is how the floor should look after a year of use. A solid color shows everything, which helps in a kitchen where you want to see what needs mopping and hurts at a front door that takes grit all day. Flake hides dirt and small scuffs between cleanings. Solid is the easier floor to patch if a section gets gouged, because there is no broadcast pattern to line up. We will tell you which one we would put down in your space, and why, before you sign anything.

On the morning you reopen, we walk the finished floor with whoever runs the building. We show where the coating turns up the wall, where the lane lines sit, and what to keep off the surface while it finishes curing. If something looks off to you, that is the moment to say it, while the person who put the floor down is standing right there. Most managers also want a short note on what to mop with and how often, so we leave that in writing along with the product data sheets for the system we used.

Coated Between Closing Time and Opening Time

Robert walks the space, reads the slab, and writes a quote with the prep, the system and the reopen date spelled out. Certificates of insurance go out on request.

Call (704) 775-1120 Request a Site Walk
QUESTIONS

What Davidson Business Owners Ask Us


Can you coat our Davidson storefront without closing during business hours?

Usually, yes. Most small shops and offices fit between closing on Saturday and opening on Monday, and bigger spaces get split into sections so part of the business keeps running. We work out the timeline at the walkthrough and put it in writing before you commit to anything.

Is a coated floor safe in a wet restaurant kitchen?

That is what the texture is for. In prep, dish and walk-in areas we broadcast a slip-resistant aggregate into the coating and seal over it, so there is grip under wet shoes. An integral cove runs up the base of the walls, leaving no joint where grease and water can collect.

Will the smell bother tenants upstairs or next door?

Some coatings smell stronger than others, and we choose with that in mind when a building is occupied. We plan ventilation with your property manager, give neighboring tenants a heads-up, and schedule the grinding and first coats for the hours when the fewest people are inside.

Why do you take moisture readings before quoting a commercial floor?

Because the slab decides the primer. Older slabs rarely come with paperwork about what sits underneath them, and moisture pushing up through concrete is what lifts a coating months later. If the readings come back high, the quote carries a moisture-mitigating primer in place of a standard one.

Should our commercial floor be flake or a solid color?

It depends on the room. Flake hides grit and scuffs at entries and on sales floors. Solid color makes spills easy to spot in a kitchen and is simpler to patch later, since there is no pattern to match. We recommend one at the walkthrough and explain the reasoning.

How thick is the coating on a commercial floor?

General commercial broadcast systems run about 30 to 40 mils total, and floors that take heavy carts or equipment get built thicker. Thickness, resin type, prep method and cure time all go in the written quote, so you can hold our number up against anyone else’s line by line.

Do you send a crew, or does the owner do the work?

Robert owns the company and installs every floor. There are no subcontractors on a Carolina Epoxy job, so the person who walked your space and wrote the quote is the one grinding and coating it. Davidson runs on the Charlotte calendar, and the drive is already included.

Floors We’ve Already Finished

Our gallery holds commercial and home floors from around the Charlotte metro. Look through it, then tell us what your space has to survive.